Granite Cladding South Africa is stone on a wall rather than under your feet, and it is a different trade to laying a floor. Anything above a certain height has to be mechanically fixed rather than stuck on, the substrate has to carry the weight, and the setting out has to be right from the first course or every joint above it drifts. Say the square metres and whether the wall is inside or out.
Super easy & fast
- Know the supply rate and the fixing rate apart, so you never pay too much.
- Send the same wall to several stone specialists, and quotes come back fast.
- From LEADERR APPROVED providers, vetted and backed by many verified 5-star reviews. Peace of mind that the fixing method is stated on the quote.
Describe the wall and get granite cladding quotes.
Get the Best QuoteGranite Cladding Prices
Ballpark figures so you can check a quotation.
| Item | Ballpark price |
|---|---|
| Granite cladding supplied and fitted, per square metre | R1,600 - R4,200 |
| Premium granite cladding, per square metre | R4,200 - R8,500 |
| Mechanical fixing surcharge, per square metre | R250 - R900 |
| Mitred external corner, per metre | R450 - R1,400 |
| Coping or capping, per metre | R400 - R1,500 |
| Fireplace surround supplied and fitted | R6,000 - R25,000 |
| Column or pillar clad, each | R4,500 - R18,000 |
| Substrate preparation, per square metre | R150 - R500 |
| Scaffolding, per day | R800 - R2,500 |
| Sealing the finished wall, per square metre | R80 - R250 |
Prices JUST UPDATED. Ballpark figures, rounded, excluding VAT. They reflect typical South African stone fabrication and restoration rates. They are not our prices or quotations, and no provider is bound by them. Stone is quoted on the MATERIAL and on the SQUARE METRES, the METRES OF VISIBLE EDGE and the CUT-OUTS that go with it, so confirm what each quotation includes, such as the site visit and template, the slab itself, the edge profile, every cut-out, delivery and carrying it in, the fitting, the sealing, and whether taking the old surface away is in the figure.
Inside and Outside Are Different Jobs
- An interior feature wall. Usually adhesive fixed, and the look is everything.
- A fireplace surround. Heat, and the fit around the opening.
- An exterior facade. Mechanically fixed, with a drained cavity behind it.
- A boundary or entrance wall. Weather on both faces, and ground moisture below.
- Pillars and columns. Mitred corners, which are the expensive part.
How It Is Fixed
- Adhesive. Only up to modest heights and on a sound substrate.
- Mechanical anchors. Pins or cramps into the structure behind it.
- A rail system. For larger facades, with the stone hung off brackets.
- Movement joints. An external elevation expands, and it must be allowed to.
- Drainage. Water gets behind cladding, and it needs a way out.
What Makes It Look Right
- Setting out. Start from the centre line, not from one end.
- Mitred corners. A returned mitre reads as solid stone; a butt joint does not.
- Matched slabs. Ordered together so the colour runs through.
- Consistent joints. Same width all the way up, which is set out at the start.
- The top edge. A coping or a clean stop, never a raw cut.
Get a price for your own wall rather than a range.
Get the Best QuoteWhat Affects the Price
- Which granite. The supply rate, and it is most of the figure.
- The square metres. Measured off the elevation, including returns.
- Inside or outside. External work needs fixings, joints and often scaffolding.
- The height. Above a couple of metres everything gets slower and dearer.
- Corners and returns. Mitres are the most skilled cuts on the job.
- What is behind it. A substrate that cannot carry stone has to be built up.
What to Include in Your Request
- The address. Suburb and town, so you reach specialists who work there.
- The square metres. Width and height of each face, roughly is fine.
- Inside or outside. And how high off the ground it goes.
- What the wall is. Brick, block, concrete or board.
- How many corners. And whether you want them mitred.
- Photos. The whole elevation, and one close enough to see the surface.
Before the Cladding Is Ordered
- Ask how it is being fixed. Adhesive alone on a tall external wall is a problem.
- Ask about the substrate. Whether it can carry the weight as it stands.
- Ask about water behind it. Where it goes, on anything external.
- Ask about corners. Mitred or butted, because they look completely different.
- Ask about the setting out. Where the first joint falls, and where the cuts land.
- Ask about access. Scaffolding is often a separate line and is easy to miss.
Granite Cladding FAQs
How much does granite cladding cost in South Africa?
Supplied and fitted, granite cladding is commonly R1,600 to R4,200 a square metre, with premium stones at R4,200 to R8,500. Mechanical fixing adds R250 to R900 a square metre, mitred external corners are R450 to R1,400 a metre, and scaffolding on anything tall is usually charged separately.
Can granite cladding be glued to a wall?
Up to modest heights on a sound, dry internal substrate, yes, and it is done constantly on feature walls. On a tall wall or anything external it should be mechanically fixed as well, because adhesive alone has to carry the weight for decades through heat, cold and water. Ask which method is quoted and why.
Is granite suitable for an exterior wall?
It is one of the best stones for it. Granite is dense, it does not mind rain or ultraviolet light and it keeps its colour, which is why it appears on office facades and entrance walls across the country. What matters is the fixing, the movement joints and letting water that gets behind it drain away.
What thickness is used for cladding?
Thinner than a worktop, usually, because weight is the constraint on a wall rather than strength underfoot. The right thickness depends on the panel size, the height and the fixing method, so it is a question for whoever is designing the fixing rather than a number to specify in advance. Ask what they propose and why.
How long does a clad wall take?
A small interior feature wall is often two to three days including setting out. An external elevation with mechanical fixing, mitred corners and scaffolding runs into weeks, and the stone has to be ordered and cut first. Ask for the fixing start date rather than the order date.
Cladding is priced on the fixing as much as on the stone, and Marble Services South Africa is the quickest way to see how several specialists would approach it.
Related Services
Get the Best Quote, Fast
Client Reviews
Powered by leaderr

